HOLY CROSS ELEMENTARY SEISMIC UPGRADES
Built in the 1960s, Holy Cross Elementary needed more than a structural upgrade. It needed a careful renewal that would strengthen the school while improving how it functions every day. Through ETRO Revive, the team reinforced the foundations and superstructure, renewed the roof and building envelope, modernized key mechanical and electrical systems, and refreshed classrooms, staff areas and shared spaces.
The challenge was threading major seismic work through an active school. New shear walls, steel bracing, roof ties and structural supports had to be integrated around existing conditions, occupied spaces and live building systems. ETRO used VDC to plan sequencing, logistics and safety, then phased the work with tight hoarding, dust and noise controls. The result is a safer, stronger and more resilient school ready to serve its community for years to come.